Exploration expenditure
Table 54: Exploration expenditure
|
|
|
Mine / Project |
Number of
drill holes |
Total
cost
(Rm) |
|
Number of
drill holes |
Drilling
cost
(Rm) |
Analysis
and other
costs
(Rm) |
Total
costs
(Rm) |
|
Number of
drill holes |
Total
cost
(Rm)** |
Belfast |
51 |
1.3 |
| 53 |
2.4 |
1.0 |
3.4 |
| 10 |
0.5 |
Leeuwpan |
10 |
0.5 |
| 12 |
0.4 |
0.2 |
0.6 |
| 10 |
0.7 |
Matla*** |
31 |
26.2 |
| 53 |
18.7 |
1.3 |
20.0 |
| 55 |
18.0 |
Grootegeluk |
63 |
7.3 |
| 36 |
2.9 |
| 2.9 |
| 112 |
29.7 |
Thabametsi**** |
| 0.8 |
|
|
|
| 1.2 |
|
| 0.8 |
Others (projects not reported) |
|
|
|
|
|
|
|
|
| |
Total |
|
|
| 154 |
24.3 |
2.5 |
28.0 |
| 187 |
49.7 |
Mafube (not under operational control) |
141 |
6.3 |
| 295 |
10.2 |
4.4 |
14.6 |
| 181 |
10.1 |
Moranbah South project
(not under operational control)***** |
12 |
A$2.5m |
| 5 |
A$0.78 |
A$0.71 |
A$1.49 |
| 2 |
A$9.7 |
* |
Non-committed. |
** |
Includes all associated exploration cost such as drilling, geophysics surveys and geotechnical, hydrogeological and metallurgical test work, excluding personnel, and excludes horizontal drilling. |
*** |
2021 cost includes directional surface-to-seam drilling. |
**** |
Includes Resource studies. |
***** |
Include surface to in-seam drill holes drilled with two branches. |
No exploration was conducted on areas not included in the Coal Resource statement. Exploration plans are available on request at the company secretary.
Mafube operations