Exxaro Resources Limited
Consolidated Mineral Resources and
Mineral Reserves report
31 December 2023

Base Metal Reserves

Table 13: Base Metal Reserves

  2023 2022
      Grade and contained metals Grade and contained metals %
Change in
RoM3
Operation1 LoM
(years)
Category RoM
(Mt)2
%
Zn
%
Pb
%
Cu
Ag
g/t
RoM
(Mt)2
%
Zn
%
Pb
%
Cu
Ag
g/t
BMM Deeps mine4 Proved 0.3 3.1 2.6 0.3 41 0.5 2.2 2.5 0.3 31 (44)
Northern Cape(UG) (zinc, lead, copper and silver) 2 Probable 1.5 2.9 1.4 0.5 21 2.4 2.5 1.2 0.5 20 (39)
26% attributed to Exxaro2   Total 1.7 2.9 1.6 0.5 24 3.0 2.5 1.5 0.5 22 (43)
  Inferred Resources inside LoMP 0.0   0.0
BMM Swartberg mine5 Proved 0.0
Northern Cape(OC/UG) (zinc, lead, copper and silver) 24 Probable 53.8 0.6 1.9 0.4 31 48.0 0.6 2.0 0.4 33 12
26% attributed to Exxaro2   Total 53.8 0.6 1.9 0.4 31 48.0 0.6 2.0 0.4 33 12
  Inferred Resources inside LoMP 0.0     0.0
Gamsberg North mine Proved 65.1 6.4 0.5 69.7 6.4 0.5 (7)
Northern Cape(OC) (zinc) 12 Probable 26.5 5.0 0.5 27.1 4.9 0.5 (2)
26% attributed to Exxaro2   Total 91.6 6.0 0.5

96.8 6.0 0.5

(5)
  Inferred Resources inside LoMP 0.0   0.0
  • Rounding of figures may cause computational discrepancies.
  • Percentage zinc (% Zn), percentage copper (% Cu), percentage lead (% Pb), grams per tonne silver (Ag g/t), percentage manganese (% Mn) and percentage sulphur (% S).
  • Tonnages are quoted in metric tonnes and million tonnes is abbreviated as Mt.
  • Reserves are quoted on a RoM Reserve tonnage basis, which represents tonnages delivered to the plant at applicable moisture and quality.
  • Inferred Resources in LoMP refer to Inferred Resources considered for the LoMP.
  • Estimates are as received from Vedanta Resources at 31 March 2023 and are not audited by Exxaro.
  • All changes more than 10% are explained.
1 Operation refers to the BMM operating mine or significant project. Mining method: opencast (OC) or underground (UG).
2 Figures are reported at 100%, irrespective of percentage attributable to Exxaro, and refer to March 2023 only.
3 The percentage difference between 2023 reported RoM and 2022 reported RoM. Brackets signify a decrease.
4 The decrease is the result of mining depletion and updated Australian mining consultants stope designs.
5 The increase is the result of additional stope designs provided for the current UG mine.