The table below details the total Coal Reserves estimated as at 31 December 2023.
Table 10: Coal Reserves
2023 | 2022 | ||||||||||||
RoM and saleable tonnes4 | RoM and saleable tonnes4 | % change in RoM5 |
|||||||||||
Operation1 |
LoM (years)3 |
Category |
RoM (Mt) |
RoM moisture % |
Export (Mt) |
Thermal (Mt) |
Metal- lurgical (Mt) |
RoM (Mt) |
RoM moisture % |
Export (Mt) |
Thermal (Mt) |
Metal- lurgical (Mt) |
|
Matla6 (UG) |
Proved | 126 | 9.5 | 126 | 130 | 9.5 | 130 | (3) | |||||
(captive market) | 1+ | Probable | 31 | 9.5 | 29 | 38 | 9.5 | 38 | (18) | ||||
100% attributed to Exxaro2 | Total | 157 | 9.5 | 162 | 167.4 | 9.5 | 167 | (6) | |||||
Inferred Resourcesinside LoMP | 5 | 6 | (11) | ||||||||||
Leeuwpan7 (OC) |
Proved | 30.5 | 3.1 | 22.7 | 36.1 | 3.1 | 26.4 | (15) | |||||
(commercial market) | 6 | Probable | 3.3 | 2.6 | 1.5 | 3.3 | 2.6 | 1.5 | – | ||||
100% attributed to Exxaro2 | Total | 33.8 | 3.0 | 22.7 | 1.5 | 39.4 | 3.1 | 26.4 | 1.5 | (14) | |||
Mafube8 | Inferred Resourcesinside LoMP | 0.0 | 0.0 | ||||||||||
(OC) | Proved | 82.6 | 8.0 | 46.9 | 9.7 | 80.6 | 8.0 | 44.2 | 12.7 | 2 | |||
(commercial market) | 20 | Probable | 32.0 | 8.0 | 20.6 | 0.6 | 40.8 | 8.0 | 25.6 | 1.2 | (22) | ||
50% attributed to Exxaro2 | Total | 114.7 | 8.0 | 67.5 | 10.3 | 121.4 | 8.0 | 69.8 | 13.9 | (6) | |||
Inferred Resourcesinside LoMP | 0.2 |
1.6 | (87) | ||||||||||
Belfast (OC) |
Proved | 33.2 | 3.4 | 29.4 | 35.8 | 3.4 | 31.6 | (7) | |||||
(commercial market) | 10 | Probable | 1.4 | 2.9 | 1.1 | 1.4 | 2.9 | 1.1 | – | ||||
100% attributed to Exxaro2 | Total | 34.6 | 3.4 | 30.5 | 37.2 | 3.4 | 32.7 | (7) | |||||
Inferred Resourcesinside LoMP | 1.0 | 1.0 | 5 | ||||||||||
Grootegeluk mine (OC) |
Proved | 1 971 | 3.0 | 123 | 742 | 56 | 2 034 | 3.0 | 126 | 776 | 58 | (3) | |
(commercial market) | 18+ | Probable | 550 | 3.0 | 37 | 191 | 6 | 550 | 3.0 | 37 | 191 | 6 | – |
100% attributed to Exxaro2 | Total | 2 521 | 3.0 | 160 | 933 | 62 | 2 584 | 3.0 | 163 | 967 | 64 | (2) | |
Inferred Resourcesinside LoMP | 73 | 73 |
(1) | ||||||||||
Thabametsi project (OC) |
Proved | ||||||||||||
(IPP market) | 23 | Probable | 130 | 3.0 | 127 | 130 | 3.0 | 127 | – | ||||
100% attributed to Exxaro2 | Total | 130 | 3.0 | 127 | 130 | 3.0 | 127 | – | |||||
Inferred Resourcesinside LoMP | 0.0 | 0.0 |
1 | Operation refers to operating mine or significant project. Mining method: opencast (OC) or underground (UG). |
2 | Figures are reported at 100%, irrespective of percentage attributable to Exxaro, and refer to 2023 only. |
3 | The + symbol is used in instances where the scheduled LoMP extends beyond the expiry of the mining right. In each instance, Exxaro reasonably expects the mining right to be renewed. |
4 | Export refers to export thermal coal except at Grootegeluk mine, where it refers to semi-soft coking coal suitable for the export and inland markets. |
5 | The percentage difference between 2023 reported RoM and 2022 reported RoM. Brackets signify a decrease. |
6 | The mining right lapses in 2025, the LoM is scheduled for an additional 13 years thereafter. The change in the Probable Reserve is due to the update of the LoMP and reconciliation. |
7 | The decrease is the result of new drill hole information received as well as layout losses that occurred during the execution of the mine plan. |
8 | Changes are the result of the movement in the Resource base and exclusion of area due to environmental considerations. |
Table 11: Coal Reserve qualities
THERMAL saleable (Proved and Probable) |
METALLURGICAL saleable (Proved and Probable) |
COKING saleable (Proved and Probable) |
|||||||||||||||||
Tonnes | CV | % | % | % | Yield | Tonnes | CV | % | % | % | Yield | Tonnes | CV | % | % | % | Yield | ||
Operation | Seam/layer | (Mt)1 | MJ/kg | VM | Ash | S | % | (Mt)1 | MJ/kg | VM | Ash | S | % | (Mt)1 | MJ/kg | VM | Ash | S | % |
Matla mine | Seam 2 | 57.0 | 22.00 | 23.80 | 22.00 | 0.90 | 100 | ||||||||||||
Seam 4 | 99.7 | 18.80 | 22.20 | 29.50 | 1.00 | 100 | |||||||||||||
Leeuwpan mine | TC2 | 8.4 | 21.35 | 18.00 | 30.36 | 1.14 | 64 | ||||||||||||
BC2 | 14.3 | 23.60 | 23.60 | 22.55 | 0.91 | 69 | 1.5 | 28.46 | 8.10 | 13.68 | 0.95 | 44 | |||||||
Mafube mine | Middlings | 29.0 | 21.46 | 21.59 | 26.58 | 0.57 | 28 | ||||||||||||
Export | 38.5 | 26.51 | 26.75 | 13.46 | 0.46 | 37 | |||||||||||||
Crush and | 10.3 | 19.58 | 20.54 | 29.25 | 0.97 | 100 | |||||||||||||
stack | |||||||||||||||||||
Belfast mine | RB2 | 18.4 | 26.57 | 24.41 | 13.99 | 0.44 | 66 | ||||||||||||
RB3 | 6.7 | 24.25 | 22.20 | 21.00 | 0.97 | 100 | |||||||||||||
>4 800kcal/kg | 3.7 | 23.74 | 24.00 | 21.59 | 0.65 | 13 | |||||||||||||
Filter cake | 1.7 | 20.82 | 19.83 | 27.73 | 1.16 | 6 | |||||||||||||
Grootegeluk mine | All seams | 933 | 21.60 | 25.10 | 33.20 | 1.30 | 40 | 62 | 28.70 | 23.90 | 14.00 | 0.60 | 60 | 160 | 28.6 | 34.80 | 13.10 | 1.14 | 12 |
Thabametsi | T1 | 64 | 12.70 | 20.00 | 53.90 | 1.10 | 98 | ||||||||||||
project3 | |||||||||||||||||||
T2 | 63 | 11.30 | 19.00 | 55.70 | 1.00 | 98 |
1 | Saleable product tonnages are quoted in metric tonnes and million tonnes is abbreviated as Mt. |
2 | Top coal (TC) and bottom coal (BC). |
3 | Based on Thabametsi bench configuration as defined in phase 1 of the feasibility study. |